Restoration efforts are in full swing for the bridge damaged by recent flooding at Mahandri on the Mansehra-Naran road (N-15). In a statement, Spokesperson for the National Highway Authority Dr. Sohail Aftab said that a pedestrian path has been restored in Mahandri Bazar. He said that the NHA is working swiftly to facilitate vehicular movement through the Compact 200 Bridge. This acceleration of restoration work follows recent emergency measures ordered by NHA Chairman Shehryar Sultan, who inspected the site in the past few days. Source: Radio Pakistan
Home » Restoration efforts in full swing for bridge damaged by recent flooding at Mahandri
Restoration efforts in full swing for bridge damaged by recent flooding at Mahandri
Related Post
Dry Weather Forecast Across Most Regions
October 17, 2026
DPM Highlights Role of Modern Civil Aviation in Economic Growth
October 16, 2026
Government Lowers Petrol Price, Diesel Unchanged
October 16, 2026
President Zardari Expresses Sympathy Over Istanbul Floods
October 16, 2026
Mastermind of Kohat Police Lines Attack Killed in Joint Operation
October 16, 2026