Home / Tag Archives: (PPL)

Tag Archives: (PPL)

Feed Subscription

Pakistan Petroleum Limited discovers gas in Hub X-1, Balochistan

Karachi, July 24, 2018 (PPI-OT): Pakistan Petroleum Limited, operator of Hub Block (2566-4), together with its joint venture partner Sindh Energy Holding Company Limited has discovered hydrocarbons from exploratory well Hub X-1, located in District Las...

Read More »

Pakistan Petroleum Limited supports National University of Sciences and Technology and Habib University

Karachi, June 12, 2018 (PPI-OT): Pakistan Petroleum Limited (PPL) partnered with two leading universities, National University of Sciences and Technology (NUST), Islamabad and Habib University (HU), Karachi to provide quality tertiary education to dese...

Read More »

Pakistan Petroleum Limited donates Rs. 6.85 million to Association for Children with Emotional and Learning Problems

Karachi, August 04, 2017 (PPI-OT):Pakistan Petroleum Limited (PPL) donated Rs. 6.85 million to Association for Children with Emotional and Learning Problems (ACELP) for equipment of vocational training workshops and a student transport vehicle. MD and CEO PPL Syed Wamiq Bokhari handed over the donation cheque to President, ACELP Zainab Mehar Hasan at a simple event attended by officials from both organizations at PPL’s head office.

“As a leading national E and P company, we have a major stake in the country’s development with provision of education, healthcare and skills enhancement on priority, especially for women and differently abled people. We believe that quality education and care can ensure a healthy future”, highlighted Bokhari while speaking on the occasion.

Established in 1974 on a voluntary basis by a dedicated group of professionals, ACELP aims to bring especially abled children into mainstream through diagnostics, academic and vocational training. ACELP admits children of all ages and provides customized learning framework, catering to individual development needs. The focus remains on vocational training of adolescents to prepare them for earning livelihoods. PPL’s support will enable ACELP to operationalize various vocational training units, including computer and food labs, khadi and stitching as well as papermaking and block printing workshops.

For more information, contact:
Pakistan Petroleum Limited (PPL)
4th Floor, PIDC House,
Dr. Ziauddin Ahmed Road,
P. O. Box 3942,
Karachi 75530
UAN: +92-21-111-568-568
Tel: +92-21-35651480-89
Fax: +92-21-35680005, +92-21-35682125
Email: info@ppl.com.pk
Website: www.ppl.com.pk

Read More »

Pakistan Petroleum Limited drills 1.3 km-long horizontal well for tight gas

Karachi, July 20, 2017 (PPI-OT):Pakistan Petroleum Limited (PPL) recently drilled and completed tight gas horizontal well Naushahro Feroz (NF) Hor-1. At total depth of 4940 metres and 1.3 km horizontal section in Chiltan Formation, NF Hor -1 is one of the deepest and longest horizontal wells in tight gas reservoir drilled in Pakistan. It is also the country’s first well to be completed with ten-stage multi-frack. PPL made a tight gas discovery at NF X-1 in 2014. This was followed by extensive in-house geological and geophysical studies to design the optimum horizontal well to appraise the discovery.

‘Logging while Drilling’ technology with real-time evaluation was used to successfully drill the horizontal section. Based on preliminary results, the well flowed 1.3 MMscfd gas and 9 bbl/d of condensate at 32/64 choke size from one stage only. PPL plans to carry out ten-stage multi-frack job on the well which is expected to significantly increase flow potential. NF Hor-1 is in Naushahro Feroz Block, Sindh, with PPL as operator holding 90 percent working interest and the remaining 10 percent held by Asia Resources Oil Limited.

For more information, contact:
Pakistan Petroleum Limited (PPL)
4th Floor, PIDC House,
Dr. Ziauddin Ahmed Road,
P. O. Box 3942,
Karachi 75530
UAN: +92-21-111-568-568
Tel: +92-21-35651480-89
Fax: +92-21-35680005, +92-21-35682125
Email: info@ppl.com.pk
Website: www.ppl.com.pk

Read More »
Scroll To Top